A demurrage bill
A container that cannot clear because the goods do not match the documentation does not wait for you. It sits, and it costs.
Inspection & QC
检验
Our professional team of translators and inspectors finalize the job to satisfaction. That is not a slogan from 1998 — it is the part of the process most importers are asked to take on trust, and the part we refuse to.
What we check
You write the checklist — or we draft it from your specification and you approve it. Then our inspector works to that document and reports against it.
The report
Photographs, measurements and a written pass/fail against each line of the checklist, within 24 hours of the inspection. If the run fails, we hold it and tell you before the container is sealed — not after it has sailed.
Why it matters
A container that cannot clear because the goods do not match the documentation does not wait for you. It sits, and it costs.
Selling stock that does not meet its own specification, into a market that finds out, is worse than not shipping it at all.
Replacing a failed production run costs the goods, the freight and the time. It is the most expensive line in the whole order.
Tell us what the specification is and we will quote the inspection. It usually costs less than one percentage point of the order — and it is the cheapest insurance in the transaction.